Rename a measure or column without breaking visuals
Power BIReports connected live to a semantic model are not told about a rename. Their visuals keep the old name and show Something's wrong with one or more fields.
Reports on a live connection are not told
A report connected live to a published semantic model keeps the names of the fields its visuals use. Microsoft, quoted on the forum, says this is by design: the report is independent of the model and is not aware that a field was renamed.
So when you rename a measure in the model, a visual in another report that uses it breaks. The same thread reports that custom and conditional formatting on that field break too.
Source: Changing name of a measure results in broken visuals in related reports.
What the visual shows
The visual says Something's wrong with one or more fields. See details lists the fields that need to be fixed.
The page for that message:
Source: How to rectify this error: 'Something's wrong with one or more fields'.
What Fix this does
Fix this removes the broken column or measure from the visual, a Microsoft support reply on the forum says. To keep the visual as it was, replace the field by hand with the one under its new name.
Source: Reports show 'something's wrong with one or more field' after re deploying SSAS tabular model, Changing name of a measure results in broken visuals in related reports.
Inside one file
Forum users report that Power BI Desktop updates the visuals in the same file when you rename a field there. One reports that a measure renamed in an external tool did break its visual.
Microsoft Learn says Power BI keeps some bindings through a rename by the lineage tag of the object, such as in composite models. Without a lineage tag it falls back to the name, which can lose customizations.
Source: Rename Column or Table without breaking reports/dashboard, Changing name of a measure results in broken visuals in related reports, Lineage tags for Power BI semantic models.
Before you rename
Find the reports that connect to the model first. Impact analysis in the Power BI service counts the reports and dashboards a change to a semantic model might affect. It needs write permission, and it does not say which visuals use a field.
Source: Semantic model impact analysis.
Check a project in your browser
The Power BI Report Doctor reads a PBIP folder or .zip and lists the file and line to fix. Nothing is uploaded.
For a PBIP project, check the rename in Power BI Studio first. Check a change marks each visual in the project it would rewrite as Updated, and Apply downloads the project with them rewritten. Reports in other files still need the new name by hand.
Other guides
- What is a PBIP project, and what is TMDL?A Power BI project (PBIP) saves a report and its semantic model as plain text files in folders, instead of one
.pbixfile. - Power BI Desktop can't open a PBIPWhen Power BI Desktop refuses a project, the message usually names a file.
- PBIR vs PBIR-LegacyPBIR saves a report as a folder with a file for each page, visual and bookmark.
- PBIP and Git: what to commit and what to ignoreA PBIP project is plain text, so Git can track it.
- Turn a .pbix into a PBIP projectPower BI Desktop converts a .pbix to a PBIP, and back, with File > Save as.
- Find where a measure is usedPower BI Desktop does not list the visuals that use a measure, and lineage in the service stops at whole reports.
Sources
- Microsoft forum: Changing name of a measure results in broken visuals in related reports. The question (2020-04-09), Community Support's replies of 2020-04-14 and 2020-04-22, quoting Microsoft, and the replies of 2024-01-18. Read 2026-11-08.
- Microsoft forum: How to rectify this error: 'Something's wrong with one or more fields'. The question and the accepted solution, both 2023-03-08. Read 2026-11-08.
- Microsoft forum: Reports show 'something's wrong with one or more field' after re deploying SSAS tabular model. Community Support's reply of 2017-02-22. Read 2026-11-08.
- Microsoft forum: Rename Column or Table without breaking reports/dashboard. The question (2020-01-29) and the replies of 2023-04-15 and 2023-04-18. The thread has no accepted solution. Read 2026-11-08.
- Microsoft Learn: Lineage tags for Power BI semantic models. The introduction. Page dated 2025-01-06. Read 2026-11-08.
- Microsoft Learn: Semantic model impact analysis. The introduction, what it counts and the permission it needs. Page dated 2025-11-01. Read 2026-11-08.